by Desert Dog » September 30th, 2011, 1:27 pm
Painted and installed. Wearing Krylon black rattle-can just like the rest of my junk. I neet to install the ORO Litedots and add a little silicon to the gaps, then the comp cut will be done. Then on Monday, its off to G&G to have the frame notched and the coilover towers welded in. Rock Krawler is taking forever to send me my upper 3-link bracket and axle truss, so that might be a hold-up to the project.
[attachment=0]stretch 5.jpg[/attachment]
You do not have the required permissions to view the files attached to this post.
I AM THE TITTY MASTER